Day 10 of Pool Construction

July 26th, 2006 at 8:33 pm

Premium H20! Today they completed the floor, installed the liner, began filling it with water, and hooked up the pump equipment. We are keeping our fingers crossed for a dip this weekend!



Roughly speaking…Day 9 of Pool Construction

July 24th, 2006 at 7:46 pm

Unfortunately we lost four days due to a damaged skimmer that had to be reordered, but now it has been fixed and the final days are in sight.

Landscaping begins by yours truly…
I worked all weekend on the front area of the pool, preparing the soil and planting the grass. In addition, I planted 5 of our 7 Green Giant Arborvitae trees.

The concrete deck has been poured.
Now all that is left is a little more work on the inside floor, installation of the liner, and electrical wiring.



More pool pictures…

July 18th, 2006 at 7:54 pm

Day 6 & 7: Rough grading, plumbing, and deck forms

Day 8: Pool bottom/floor is installed



Day 5 of Pool Construction

July 13th, 2006 at 5:38 pm

Today they continued to backfill and remove excess dirt from the yard. In addition, they completed more plumbing and line work. I didn’t post a photo, because visually there is not much more to see at this point. I will post one after the work tomorrow is completed. Have a great weekend!



Day 4 of Pool Construction

July 12th, 2006 at 7:52 pm

Today they installed french drains around the pool to reduce the pressure of ground water, began to backfill around the outside of the pool, and removed some of the excess dirt from our yard.